Getting connected with Green GEN Cymru is simple and transparent.
Our connection guide can be found on the documents page.
Here’s how it works:
.01 We assess the opportunity
Our team will review your requirements and the location to determine the feasibility of connection.
.02 Receive a connection offer
We’ll provide a clear, competitive proposal tailored to your project.
.03 Design and build
Once accepted, we’ll begin designing and constructing the network – covering all associated costs. Alternatively, an ICP can be chosen to design and build the Sole Use works instead of GreenGen Cymru (GGC).
.04 Connection and operation
You’re connected! We’ll continue to maintain and operate the network, ensuring long-term performance and support.